02 — Reliability

Certified for the mission.

One audited pipeline. Signed provenance for every binary that flies.

Engineer calibrating a flight unit on the bench

Figure 01 — Golden-build bench, Plant 2

Close-up of machined aluminum flight hardware

Figure 02 — A-1 airframe, pre-vibration test

1

Build pipeline

100%

Signed binaries

180hr

Vibration before ship


Next: the complete datasheet for the A-1.

Specifications →